
Expansion of the Transformer assembly line
In 2016, SUESA separated the assembly of high voltage transformers to give it the importance that the activity itself had been demanding. To do this, an independent management was proposed with

In 2016, SUESA separated the assembly of high voltage transformers to give it the importance that the activity itself had been demanding. To do this, an independent management was proposed with

At Suesa we are very aware that the application of a defibrillator to a victim of cardiac arrest increases their chance of survival in a 90%.In Europe, it is a

SUESA has participated in the SUBCONTRATACION fair held at the BEC between October 26 and 28, 2021, where it has shown its wide range of transformers and

We are closed for the mandatory summer holidays from 31/08 to 31/09, both inclusive.

SUESA has participated in the Subcontracting Fair held in Bilbao from 4 to 6 June.

On May 21-23, SUESA will visit the CWIEME fair in Berlin.

And we inform you that we will be closed from 12/22 to 12/25 and from 12/29 to 01/02.

International fair of materials and machinery for the production of electric motors.

Why is it important to have proper transformer winding?

Tips to save energy in summer, reducing consumption and gaining comfort.

How does our energy expenditure affect the environment and ourselves?